Home / Rigging / Lifting & Spreader Beams / Tandemloc Spreader Beam End Caps
Tandemloc Spreader Beam End Caps
Tandemloc Spreader Beam End Caps
Secure Payment Transaction Guarantee
Choose Rapid Shipping at Checkout
24/7 U.S. Based Customer Service Help
Quick Overview:
Customers Also Bought
Tandemloc Spreader End Caps enable you to build your own custom spreader beams and modular spreader bars without the custom costs and heavy lead times associated with such builds. High capacities from 14,000Lb to 1,544,000Lb per end cap, enabling a complete Spreader Bar assembly capacity up to 3,088,000Lb provide even the most demanding loads a quick and cost-effective solution.
BEST USED IN COMBINATION WITH TANDEMLOC ADJUSTABLE SPREADER BAR KITS Purchase your end caps and the required size spreader beam kit for the ultimate fast field-adjustable solution.
Pipe Diameters: 3"-32"
We recommend that prior to purchasing Tandemloc Steel End Caps that you run your requirements through the Tandemloc End Cap App.
What You Get
- 1 x Tandemloc AC25C Series Steel End Cap (you'll need 2 so ensure you add 2pcs to your basket)
What You Will Need To Know
- The span of your spread
- Weight of the load
- Weight of the assembled lifter
You should also consider any height restrictions that will dictate the lifting sling height above the load.
What You Will Need To Add
- Appropriate sized pipe as per the below table 3"-8" End caps require schedule 80 pipe, whilst 10" End Caps and larger require schedule 60 pipe
- Shackles and slings as per your requirements
Based On Primary Sling Angle For Maximum Spread 45 Degrees
End Cap Model | Maximum Capacity (Per Cap) | Maximum Capacity (Pair) | Maximum Spread | Capacity (per pair) @ Max. Spread | Spread @ Max. Capacity | |
---|---|---|---|---|---|---|
|
14,000Lbs | 28,000Lbs | 19ft | 4tons | 11ft | |
|
26,000Lbs | 52,000Lbs | 19ft | 4tons | 8ft | |
|
26,000Lbs | 52,000Lbs | 24ft | 7tons | 12ft | |
|
26,000Lbs | 52,000Lbs | 30ft | 10tons | 18ft | |
|
26,000Lbs | 52,000Lbs | 36ft | 13tons | 26ft | |
|
50,000Lbs | 100,000Lbs | 24ft | 7tons | 9ft | |
|
50,000Lbs | 100,000Lbs | 30ft | 10tons | 13ft | |
|
50,000Lbs | 100,000Lbs | 36ft | 13tons | 19ft | |
|
50,000Lbs | 100,000Lbs | 48ft | 19tons | 30ft | |
|
85,000Lbs | 170,000Lbs | 36ft | 13tons | 14ft | |
|
85,000Lbs | 170,000Lbs | 48ft | 19tons | 23ft | |
|
85,000Lbs | 170,000Lbs | 60ft | 25tons | 19ft | |
|
130,000Lbs | 260,000Lbs | 60ft | 24tons | 27ft | |
|
130,000Lbs | 260,000Lbs | 72ft | 29tons | 35ft | |
|
170,000Lbs | 340,000Lbs | 79ft | 58tons | 47ft | |
|
500,000Lbs | 1,000,000Lbs | 100ft | 249tons | 71ft | |
|
1,104,000Lbs | 2,208,000Lbs | 100ft | 758tons | 83ft |
- Painted with abrasion resistant, high gloss, two part epoxy finish in Safety Yellow
- Assemblies can be proof tested and certified for the loads shown in the chart
- Use two end caps- one on each end of a compatible pipe (see below for pipe specs)
- All sizes over 8" feature one or two D-rings for easy handling of the end cap alone
- Does not include central pipe section- can be supplied on request
- Proof tested to 125% of the Working Load Limit
- 3"-8" End caps require schedule 80 pipe (found at almost all pipe dealers!), whilst 10" End Caps and larger require schedule 60 pipe
- 3-32" Pipe diameter
- Minimum spread: 3ft
- Maximum spread: 100ft
- 3"-8" End caps require schedule 80 pipe (found at almost all pipe dealers!), whilst 10" End Caps and larger require schedule 60 pipe
Frequently Asked Questions
see all faqsCan I order from outside of the US?
Absolutely, our solid relationships with freight agents, couriers, and international airlines make it easy.
You can easily order goods from LES USA for delivery outside of the United States. Our network of global logistics partners deliver to almost every corner of the planet. Buy online internationally or contact our export department for a quotation.
Did you know you can purchase Tax-Free if you are outside of the USA? See 'Can I use a Resale Certificate?'
When will I get my goods?
All of our product listings show an "Estimated Lead Time To Dispatch" and the delivery transit time is determined by the service you opt to select in the checkout.
Our aim is to deliver products throughout the United States fast and efficiently. Our website clearly displays "Estimated Lead Time To Dispatch" for every item, this is the time it takes to prepare the item for shipment. When you arrive at the 'Checkout' you are able to select the desired shipping service such as "Standard Ground Shipping 2-3 days".
If the product "Estimated Lead Time To Dispatch" is 2-3 days and you selected "Standard Ground Shipping 2-3 days" service you can expect that your order will be delivered within 4-6 days from the point of order.
For international orders, delivery times may differ, see our Shipping page
Can I use a resale certificate?
You can use a resale certificate when purchasing from LES USA.
We accept most re-sale certificates from customers who are genuinely purchasing the product with the intention to re-sell. Our team will perform the necessary reasonable due diligence required to confirm that the items will be resold.
When shipping outside of the United States sales tax can be refunded if you are able to provide us legitimate evidence that the goods have been exported outside of the USA, alternatively, we can avoid adding sales tax initially by having LES handle the export and shipping of the goods outside of the country.
Do I get a certificate with my item?
Yes, if applicable.
If applicable we will provide you with the necessary documentation/certification required for your products purchased from LES.
Can you price match or beat an existing quote?
We always do our very best!
When it comes to pricing LES strive to be competitive and this means that we will always offer a fair price. Should you find an item cheaper elsewhere prior to your purchase let our team know here and we will do our very best to do better.